Skip to content
Contact

Tell us what needs to stay powered.

Share the load, the backup time, and the site conditions. We will map them to a UPS, stabilizer, and battery configuration.

TL;DR

An engineer reads every inquiry, and a complete one — load list, runtime, phase, site country, certification requirement — is answered within 24 hours with a capacity range and the configuration that fits it. The message field matters more than the form: a short load list beats a long description.

Phone / WhatsApp

Address

HENGLAN Office, Room 307F, Huilange BLDG, No. 273, Huangpu Blvd W, Tianhe District, Guangzhou 510620, Guangdong, China

Email

sale@upsavrfactory.com

For drawings, load lists, and tender documents.

What to send

  • Total load in kW or kVA, plus the largest motor or compressor
  • Required backup time in minutes
  • Single-phase or three-phase input, and the nominal voltage
  • Site country, altitude, ambient temperature, and installation room
  • Preferred battery chemistry, if already decided
  • Certification or documentation requirements

What happens next

An engineer reviews the load profile, proposes a capacity and battery configuration, and returns the model sheet, dimensions, and commercial offer.

Engineering review Model sheet Export documents

Project inquiry

All fields marked with * are required. The message field is the most important part.

By submitting this form you agree to our privacy policy. Privacy policy

What to send

Five inputs turn a message into a configuration.

Anything missing from this list is the first thing the reply will ask for. Sending it upfront usually removes one round trip.

Input What to send Why it changes the answer
Load kW and kVA per circuit, power factor, largest motor or compressor Sets the frame size; surge decides overload class
Runtime Minutes or hours, and whether it must expand later Sets the battery string and charger current
Site Country, voltage, frequency, phase, ambient, altitude Sets the input window and the derating
Compliance Certification or scheme the tender requires Sets the documents and the test programme
Commercial Destination port, Incoterm, OEM branding needed Sets packing, price basis and lead time
After you send

What happens next.

  1. 01

    Engineering review

    The load list is checked against the runtime and the site conditions, and missing items are identified.

  2. 02

    Configuration

    Capacity, topology, battery string and monitoring are proposed, with the reason for each choice.

  3. 03

    Quotation

    The configuration is priced line by line, with documents, packing, Incoterm and lead-time tier.

  4. 04

    Order and documents

    The model, the certificate scope and the test report are confirmed against what was ordered.

FAQ

Before you send the inquiry.

Project-specific answers. If your question is not here, send the load list and the site conditions.

Talk to an engineer

What should I include in the first message?

The load in kW, the required backup time, the phase and voltage, the site country, and any certification requirement. A simple load list is more useful than a long description.

How quickly will I receive a reply?

Every complete inquiry is reviewed by an engineer. The first reply normally confirms the missing information or returns a capacity range; the full configuration follows after the load is confirmed.

Do you provide prices without a configuration?

A price without the capacity, topology, battery, and runtime is not comparable. We quote the configuration so the price includes the battery, the monitoring, and the documentation.

Can we sign an NDA?

Yes, for project documents and drawings. Send the NDA with the inquiry and we will review it before sharing detailed drawings.

Do you support site visits?

For project orders, factory visits and remote commissioning support can be arranged. Site installation is normally handled by the local contractor.

Published Last updated Specifications and certification are confirmed per project.