Security room UPS: keep the cameras recording when the grid drops.

UPS and battery configurations for CCTV, access control and security rooms: 4–8 hour runtime, rack and tower options, PoE load planning, remote alerts.

Security room with rack UPS and monitoring equipment
Typical runtime
4–8 h
Typical UPS
1–5 kVA
Camera load
PoE
Remote alert
SNMP
TL;DR

A security system is judged by what it recorded during the incident, not by what it recorded on a normal day. If the UPS drops the NVR and the cameras during an outage, the site has a blind spot exactly when it matters. The backup must be sized for the recorder, the cameras, the network, and the access control.

Security loads are often small but continuous: an NVR draws 50–150 W, a PoE camera 5–15 W, a switch 30–100 W, and an access controller 20–50 W. The runtime target is usually 4–8 hours, which makes the battery, not the UPS, the main cost.

How do I calculate the security load?

Add the NVR, the PoE switch, the cameras, the access controllers, the alarm panel, and the monitor. Use the actual wattage, not the power-supply rating. A 16-channel NVR with four drives may draw 120 W; 16 PoE cameras at 8 W each add 128 W; a 24-port PoE switch adds 60 W; the access controllers and alarm panel add 80 W. The total is about 390 W.

Add 20–25% for growth and battery aging. For a 390 W load, design for about 480 W. A 1 kVA online UPS at 0.9 PF delivers 900 W, so it has enough capacity; the runtime is set by the battery.

Typical security loads

EquipmentTypical drawNotes
8-channel NVR + 2 drives60–100 WDepends on drives and recording mode
16-channel NVR + 4 drives100–160 WPoE budget separate
PoE camera5–15 WIR and heater increase draw
24-port PoE switch40–120 WPlus camera PoE load
Access controller20–50 WLock current is separate
Alarm panel20–60 WSiren current is separate
Monitor25–50 WOften omitted from the load list

How do I get 4–8 hours of runtime?

At 480 W and 4 hours, the usable energy is 1.92 kWh; at 80% depth of discharge, the nominal bank is 2.4 kWh. On a 24 VDC bus, that is about 100 Ah. At 8 hours, the bank doubles to about 200 Ah. A 1 kVA UPS with a 24 V 100 Ah bank is a practical 4-hour configuration; a 2 kVA unit with a 24 V 200 Ah bank covers 8 hours.

Use a long-runtime UPS with an external battery pack or a battery cabinet. Confirm the charger current; a small charger may take a long time to recharge a 200 Ah bank, and the next outage may arrive before the battery is full.

Security runtime examples at 480 W

RuntimeNominal energy24 V bank48 V bank
2 h1.2 kWh50 Ah25 Ah
4 h2.4 kWh100 Ah50 Ah
8 h4.8 kWh200 Ah100 Ah
12 h7.2 kWh300 Ah150 Ah

What else should the security room include?

  • A dedicated circuit for the UPS, not a shared lighting circuit
  • A lockable rack or cabinet for the UPS and battery
  • Ventilation for the battery and the UPS heat
  • A surge protective device on the incoming supply
  • SNMP or dry-contact alerts to the monitoring station
  • A battery test every 12 months
  • A label with the load list and the runtime target
Standards & documents

Which standards and documents are referenced on this page?

The table lists the model-specific standards and conformity documents a project buyer should ask for. Availability depends on the frame, the battery, and the destination market; request the document that names your model.

Application and protection standards

ReferenceWhat it covers
IEC 62040-1 / -2 / -3UPS safety, EMC and performance basis
IEC 61643-11Surge protective devices connected to low-voltage systems
IEC 61643-12SPD selection and application principles
IEC 61000-4-5Surge immunity test for electrical equipment
IEC 62305Lightning protection and risk management
IEC 62305-1 / -2 / -3 / -4Lightning risk, design, testing and inspection
IEC 60364-4-41Protection against electric shock
IEC 60364-5-53Switchgear, controlgear and protective device coordination
IEC 60364-5-54Earthing arrangements and protective conductors
UL 1449North American SPD safety standard
CE / RoHSEU conformity and restricted-substance declaration
ISO 9001Manufacturing quality management system

Certificates are issued against the exact model and configuration. See the certifications page for how to confirm scope and revision, or send the model to request the current document.

Reference project

What does a 96-camera security system need for 8 hours?

Ninety-six PoE cameras at an average of 8 W draw 768 W; the NVR, switches, access control and alarm panel add about 550 W. The total is 1.32 kW. A 3 kVA online UPS with a 48 V 300 Ah LiFePO4 bank delivers about 8 hours, with enough PoE budget for IR and camera heaters.

Total load
1.32 kW
UPS size
3 kVA
Runtime
8 h
DC bus
48 V

Load and battery estimate

Load groupReference valueNotes
96 PoE cameras768 W8 W average; IR and heaters can double it
NVR + switches450 WFour drives and a 24-port PoE switch
Access + alarm100 WLock current and siren are separate
Total1.32 kWAdd 20% for growth and aging
Battery48 V 300 Ah LiFePO4About 8 hours at 1.32 kW
  • Put the recorder, cameras and network on the UPS; leave the monitor optional.
  • Confirm the PoE switch budget, not just the camera count.
  • Use a lockable rack or cabinet and ventilate the battery.
  • Run a load test every 12 months; camera count grows quietly.

Reference configuration based on typical industry inputs. It is not a named customer project, and the image is illustrative.

Security control room with monitors and recording equipment
Industry reference image, not a named customer project
FAQ

Questions from project buyers.

Project-specific answers. If your question is not here, send the load list and the site conditions.

Talk to an engineer

How long should a CCTV UPS last?

Most security rooms target 4–8 hours. The exact runtime depends on the recorder, cameras, switch, and access control load. Size the battery from the measured wattage, not the camera count alone.

Can a line-interactive UPS run a security system?

Yes, if the load can tolerate a 4–6 ms transfer and the output is adequate. For a recorder with sensitive drives or a remote site, an online UPS is safer.

Do I need to back up the monitor?

Only if the guard needs to see the cameras during the outage. The recorder and network are the priority; the monitor can be excluded to save battery.

Can I use a PoE switch on the UPS?

Yes, but include the PoE camera load in the UPS sizing. The switch’s own draw plus the camera PoE budget is the load, not just the switch nameplate.

How do I know the battery is still good?

Run a load test every 12 months, or use a battery monitor that reports string voltage and temperature. Replace the battery when the runtime falls below the target.

Next step

Send the load list. We will return the configuration.

Tell us the kW, the backup time, the phase, and the site country. You will get a capacity recommendation, a battery configuration, and the model sheet.

  • Capacity and topology recommendation
  • Battery bank and runtime estimate
  • Model sheet and commercial offer

Request a configuration and quotation

Send the load list, backup time, and site conditions. We will return a capacity recommendation, battery configuration, and commercial offer.

By submitting this form you agree to our privacy policy. Privacy policy

Published Last updated Specifications and certification are confirmed per project.