TL;DR

The product pages on this site give the working specifications. For a tender, a design submission, or a customs file, you may need the model datasheet, the dimension drawing, the battery configuration sheet, or the commissioning checklist. Those documents are issued against the exact model and configuration.

Use the request form and tell us the model, the project country, and the document you need. We will send the current revision and confirm the model-specific values.

What documents can I request?

Document package

DocumentContentsTypical use
Model datasheetRatings, input/output, battery, dimensions, weightDesign and tender
Dimension drawingCabinet dimensions, terminals, clearanceRoom layout
Single-line diagramUPS, bypass, battery, input/output breakersElectrical design
Battery configuration sheetString voltage, block count, runtime basisBattery room and procurement
Commissioning checklistPre-checks, start-up, load test, handoverSite commissioning
Test reportModel-specific IEC 62040 or CE reportCompliance and customs
Packing listDimensions, weight, HS code, marksShipping and clearing

How do I request a document?

Send the model, the project country, and the document you need. If the project is a tender, include the specification clause you are responding to. If the document is for customs, tell us the destination port and the importer’s requirement.

We do not publish every drawing on the website because the values change with the configuration. A 10 kVA UPS with a 1-hour battery has a different drawing from a 10 kVA UPS with a 4-hour bank. The document must match the order.

Do you provide CAD or BIM files?

For project orders, we can provide dimension drawings in PDF and, where available, DWG. BIM models are not available for every frame. Tell us the frame and the level of detail you need; we will confirm what can be issued.

Standards & documents

Which standards and documents are referenced on this page?

The table lists the model-specific standards and conformity documents a project buyer should ask for. Availability depends on the frame, the battery, and the destination market; request the document that names your model.

Standards and documentation references

ReferenceWhat it covers
IEC 62040-1 / -2 / -3UPS safety, EMC and performance basis
IEC 60896-21 / -22VRLA stationary battery type and performance tests
IEC 61558-1Safety of power transformers and supply units
JB/T 10089Contact-type AC voltage stabilizer standard
IEC 62619Safety of lithium cells and batteries for industrial use
UN38.3 / MSDSLithium battery transport test and material safety data
ISO 9001Manufacturing quality management system
CE / RoHSEU conformity and restricted-substance declaration

Certificates are issued against the exact model and configuration. See the certifications page for how to confirm scope and revision, or send the model to request the current document.

Project checklists

Confirm the inputs and documents before quoting.

Project inputs to confirm

ItemWhat to confirmWhy it matters
LoadRunning kW, largest motor, load stepSets kVA, overload and topology
RuntimeMinutes, generator availability, battery roomSets battery bank and charger
SupplyVoltage, frequency, phase, input currentSets model, breaker and cable
SiteCountry, altitude, ambient temperature, dustSets derating, IP and documents
BatteryVRLA, LiFePO4, footprint, weight limitSets chemistry and room layout
DocumentationConformity route, test report, languageSets document package and lead time
FAQ

Questions from project buyers.

Project-specific answers. If your question is not here, send the load list and the site conditions.

Talk to an engineer

Are the datasheets available in English?

Yes, the standard datasheets are in English. Other languages can be prepared for project orders on request.

Can I get a drawing before placing an order?

Yes, for a defined configuration. Send the model, the battery runtime, and the site conditions; we will issue a preliminary drawing for review.

Do you provide IEC 62040 test reports?

Model-specific reports are available for qualifying models. Tell us the model and the destination country so we can confirm the current revision.

Can you issue a certificate of origin?

Yes, for export orders. The document is prepared with the shipping documents and the importer’s instructions.

How long does a document request take?

Standard datasheets are usually sent quickly. Custom drawings and test reports depend on the model and the document control process; the quotation states the expected date.

Next step

Send the load list. We will return the configuration.

Tell us the kW, the backup time, the phase, and the site country. You will get a capacity recommendation, a battery configuration, and the model sheet.

  • Capacity and topology recommendation
  • Battery bank and runtime estimate
  • Model sheet and commercial offer

Request a configuration and quotation

Send the load list, backup time, and site conditions. We will return a capacity recommendation, battery configuration, and commercial offer.